ľ¹ÏÓ°Ôº

Skip to Main Navigation

Rwanda

Kigali

image

Data Table with caption

Building Energy Code (BEC) currently in-force Ministerial Order Determining Urban Planning And Building Regulations (no. 03/cab.m/019 Of 15/04/2019)
Date of BEC publication 2019
BEC Jurisdiction National
Climate zone classification Hot, Humid
Income Group Low income
Type of BEC Performance-Based
BEC Coverage Space Cooling; Lighting
* denotes coverage is through the European Ecodesign Directive

Indicator Mandatory Minimum Requirements
Maximum Solar Heat Gain Coefficient (SHGC) ..
Roof U-value (W/m?. K)
Floors U-value (W/m?. K)
External walls U-value (W/m?. K)
Doors U-value (W/m?. K)
Air leakage prevention ..
Enforcement Mechanisms Checklist of Passive Design; Thermal Transmittance or Insulation Calculations for Building Envelope; Solar Heat Gains Calculations for Building Envelope; Glazing Factors for Fenestration; Permanent Shading